久热精品视频在线播放,黄色大片网站,天天干无码视频,最新成人AV

2020 官網(wǎng)升級(jí)中!現(xiàn)在您訪問官網(wǎng)的瀏覽器設(shè)備分辨率寬度低于1280px
請(qǐng)使用高分辨率寬度訪問。

Consultation hotline:400-021-6779

PRODUCT CENTER

PRODUCT CENTER

Burst Generator

Single phase 5kV burst generator EFT S4

Model:EFT S4

In the circuit, such as from the switching transient process (cutting off inductive loads, bouncing relay contacts, etc.), it will usually interfere with other electrical and electronic equipment in the same circuit. This kind of interference is characterized by high amplitude, short rise time, high repetition rate and low energy. Clusters of narrow pulses can charge the junction capacitance of semiconductor devices, which may cause circuit or equipment errors when accumulated to a certain extent. The burst generator determines a common reproducible evaluation basis for evaluating the performance of power supply ports, signal, control and grounding ports of electrical and electronic equipment when disturbed by electrical fast transient bursts. The products meet the requirements of new standards such as iec61000-4-4, en60100-4-4 and gb/t17626.4.

Learn more

Single phase 6kV burst generator EFT S6

Model:EFT S6

In the circuit, such as from the switching transient process (cutting off inductive loads, bouncing relay contacts, etc.), it will usually interfere with other electrical and electronic equipment in the same circuit. This kind of interference is characterized by high amplitude, short rise time, high repetition rate and low energy. Clusters of narrow pulses can charge the junction capacitance of semiconductor devices, which may cause circuit or equipment errors when accumulated to a certain extent. The burst generator determines a common reproducible evaluation basis for evaluating the performance of power supply ports, signal, control and grounding ports of electrical and electronic equipment when disturbed by electrical fast transient bursts. The products meet the requirements of new standards such as iec61000-4-4, en60100-4-4 and gb/t17626.4.

Learn more

Three phase 5kV pulse group generator EFT T4

Model:EFT T4

In the circuit, such as from the switching transient process (cutting off inductive loads, bouncing relay contacts, etc.), it will usually interfere with other electrical and electronic equipment in the same circuit. This kind of interference is characterized by high amplitude, short rise time, high repetition rate and low energy. Clusters of narrow pulses can charge the junction capacitance of semiconductor devices, which may cause circuit or equipment errors when accumulated to a certain extent. The burst generator determines a common reproducible evaluation basis for evaluating the performance of power supply ports, signal, control and grounding ports of electrical and electronic equipment when disturbed by electrical fast transient bursts. The products meet the requirements of new standards such as iec61000-4-4, en60100-4-4 and gb/t17626.4.

Learn more

Three phase 6kV pulse group generator EFT T6

Model:EFT T6

In the circuit, such as from the switching transient process (cutting off inductive loads, bouncing relay contacts, etc.), it will usually interfere with other electrical and electronic equipment in the same circuit. This kind of interference is characterized by high amplitude, short rise time, high repetition rate and low energy. Clusters of narrow pulses can charge the junction capacitance of semiconductor devices, which may cause circuit or equipment errors when accumulated to a certain extent. The burst generator determines a common reproducible evaluation basis for evaluating the performance of power supply ports, signal, control and grounding ports of electrical and electronic equipment when disturbed by electrical fast transient bursts. The products meet the requirements of new standards such as iec61000-4-4, en60100-4-4 and gb/t17626.4.

Learn more

Capacitive coupling clamp

Model:EFT 4C

The capacitive coupling clamp can couple the fast transient pulse group to the tested line without any electrical connection with the terminal of the tested equipment port, cable shield or any other part of the tested equipment. The capacitive coupling clamp is used in conjunction with the electric fast transient pulse group generator to superimpose interference on the input, output, control line and data line of the equipment to conduct the system anti-interference test. Comply with the standard requirements of iec61000-4-4 and gb/t17626.4.

Learn more
欧美人与雌性宠物交| 国产精品久久久久永久免费看| 在线观影| 久久青青草原亚洲AV无码麻豆| 亚洲日产一线二线三线精华液| 国产精品99无码一区二| rihansanji| 成熟丰满熟妇AV无码区| 五月天色婷婷完整版| 色噜噜狠狠色综无码| 中文字幕家教精品| 欧美日日夜夜| 久久久中文字幕亚洲一区二区| 色婷婷综合久久久久中文按摩| 天堂久久| 91麻豆一区| 青草原免费视频| 亚洲三级视频| 日本三级片久久久久久久国产| 亚洲日本欧美| 天天综合网| 亚洲中文字幕网| 一区二区三区四区国产精品| 最新2020av在线| 中出日本视频在线播放| 四虎人妻| 国产你懂得| 中文字幕二区| 日韩一级黄片在线| 狠狠躁天天躁无码中文字幕| 2O2O午夜在线| 无码午夜福利一区二区三区| 人妻少妇精品-| 日韩AV一区二区中文字幕| 久久老熟女| 久久91精品国产91久久蜜臀| 欧美日韩黄色网站| 你懂的在线观看网| 熟女少妇内射日韩亚洲| 欧美日本中文| 狠狠操免费视频|